Infinity Group for Contracting and General Supplies carried out the electrical infrastructure works for the project, including the supply and installation of the main electrical systems to ensure efficient and continuous operation.
Scope of Work:
Supplying and installing the main distribution panel (17 cells) with a medium voltage of 24 kV.
Supplying and installing electrical kiosks with the following capacities:
1500 kVA
1000 kVA
500 kVA (22/0.4 kV)
Supplying and installing SF6 Ring Main Units (3+1).
Laying medium voltage cables (18/30 kV) and low voltage cables.
Supplying and installing street lighting poles and grounding systems.
Constructing the distribution building and executing all electromechanical works.
Execution Outcome:
These works contributed to equipping the project with reliable electrical systems in accordance with the highest standards of quality and safety, ensuring the sustainability and efficiency of facility operations.